Specifications include, but are not limited to: roadway widening of Clinton Dr. and Harmon Ave. as they approach the intersection of Hamon Ave. and Center St./Clinton Dr., in order to accommodate proposed turn lanes, and approximately 150 LF of reconstructed Oak Ridge Trail realigned to fit the needs of the expanded roadway, 23,300 SF of 2" asphalt mill & overlay, a reinforced concrete retaining wall and four block retaining walls of variable heights, associated earthworks curb & gutter, sidewalk, driveway tie-ins and striping, installation of electrical conduit to assist with the relocation of overhead electric to underground electric and intersection signalization. Construction of stormwater drainage improvements that are not in the direct vicinity of the intersection are also included.