Specifications include, but are not limited to: Removal of existing 48” steel pipe culverts (Loyd Henderson Rd.) and double concrete box culvert (driveway on S. Fir St.), installation of 32-LF of 8x8 box culverts (Loyd Henderson Rd.), two 20-FT wide C.I.P. concrete bridges (driveways on S. Fir St), one 60-FT wide C.I.P. concrete bridge (Street extension to join S. Fir St.), approximately 771 LF of concrete trapezoidal ditch paving, concrete culvert headwalls, concrete cut-off walls, rip-rap, relocation of existing utilities, traffic control, erosion and sedimentation control, asphalt repair and paving, concrete driveway repair and paving, and miscellaneous and ancillary items as shown on the plans or described in the specifications.