Specifications include, but are not limited to: 1.1 Vendor is to provide equipment, outside duct transitions, and any other materials for a complete installation of four packaged heat/cool units at the Academic Building of the Trusty Camp SAFP facility at the Stringfellow Unit. 1.2 Vendor is to disconnect the gas and electrical and ductwork from the existing HVAC units and remove the units to a location designated by TDCJ. 1.3 Vendor is to provide all necessary lifting and transport equipment to install the new HVAC units on existing pads. 1.4 Vendor is to reconnect gas and electrical and duct connections as necessary for a complete installation. 1.5 Vendor is to startup the new equipment according to manufacturer’s recommendations and check the new equipment for proper operation. 1.6 Vendor is to install one iWave-C for each HVAC unit per manufacturer’s instruction in the supply ductwork and connect to power. See bulletin attached to this document.