Specifications include, but are not limited to: A. Emergency Restoration Service—The Contractor shall furnish personnel, equipment, tools, materials, and vehicles to provide emergency restoration services for damaged Chugach transmission and distribution facilities in accordance with the requirements of task orders assigned by Chugach. Services shall be provided on an on-call/same day response basis and is subject to Chugach’s direction. Chugach shall have prior corrective action approval and shall provide final inspection of the work.; When Work is assigned by the Operations Division, Contractor personnel shall report to Chugach’s Dispatch located in Building C, 5601 Electron Drive. At the completion of Work, Contractor’s personnel shall report to Chugach’s Dispatch. Chugach shall provide all required materials to make repairs. Materials not used shall be returned to Chugach’s Warehouse upon completion of Work. The Contractor shall provide battery-powered lights, chain saws and “hot” sticks required for each Contractor’s crew in addition to standard line tools and equipment.; Each Contractor crew shall work with the assistance of a Chugach employee (designer/inspector) assigned to that crew. Chugach’s personnel will provide system maps, switch cabinet books and other documentation necessary to complete the Work. The Contractor’s crew(s) will be required to regularly advise Chugach’s Dispatch of their location (to be identified by substation feeder, grid, street address, and/or subdivision lot and block). In addition, contact with Chugach’s Dispatch must be made upon determining the extent of damage at a location before repairs are made. Any switching necessary to isolate facilities so repairs can be completed shall be done under the direction of Chugach’s Dispatch. Re-energization of facilities after repairs have been completed shall only be done under the direction of Chugach’s Dispatch using a radio issued to the Chugach employee assigned to the crew.; B. Minor Project Support—Chugach may assign Work under a Time and Materials (T & M) basis, including but not limited to minor subdivision cable replacement, minor NESC corrections, conduit pre-installs, non-emergency maintenance and minor relocations.; C. New Services, Seasonal Influx—The Contractor shall furnish personnel, equipment, tools, materials, and vehicles to provide the installation of new services, new service Corfloburials, service upgrades, and associated distribution facility upgrades in accordance with the requirements of task orders assigned by Chugach. All Work is to be completed in accordance with Chugach’s Construction Standards and with Chugach-approved materials. Service projects shall be completed within five (5) business days of notification to the Contractor by Chugach and are subject to Chugach’s direction. Chugach shall have prior corrective action approval. Chugach shall provide for the final inspection of the work.; Chugach shall provide materials needed for distribution facility upgrades in conjunction with new services and service upgrades. Material issued by Chugach that is not used by Contractor shall be returned to Chugach’s Warehouse upon completion of the corresponding Task Order/Job Order.; Chugach personnel will provide location maps, service order or job order, material list, drawings, permits and other documentation necessary to complete the Work. Any switching necessary to complete an assigned Task Order/Job Order shall be done at the direction of Chugach’s Dispatch and in accordance with Chugach’s Dispatch clearance procedures. Contact and communication with Chugach’s Dispatch will be made using Chugach provided radio(s).