Specifications include, but are not limited to: The successful contractor shall provide all labor, materials and equipment to perform the work detailed on Sheets 1, 2 and 3 of the Plan titled SHORELINE EROSION MITIGATION, BALMORAL BEACH FINAL DESIGN, UNH STORMWATER CENTER, and dated 12/6/2017. Balmoral is a residential community comprising over 400 homes located on the southeastern shore of Moultonborough Bay Inlet on Paradise Road in Moultonborough, NH. The LWA, in partnership with the UNH Stormwater Center, developed a plan to address the erosion and stabilization of their beach area to improve and protect the water quality of Lake Winnipesaukee. This project was identified as a priority in the Moultonborough Bay Inlet Watershed Restoration Plan and will address valued habitat loss, undercut shoreline, lack of shoreline vegetation and shoreline erosion. The overall project consists of two parts, shoreline protection as identified by the plans and construction of a defined foot path to reduce further erosion. This includes site preparation, placement of materials, re-vegetation of the site and site finishing. The contractor must provide costs for all items within the project, as described below and as shown on the Plan or in specifications.