Specifications include, but are not limited to: Intersection Improvements and other incidental work. ; 0010 201.23 REMOVING SINGLE TREE TOP ONLY EA 10.000 _________._____ _________._____ 0020 201.24 REMOVING STUMP EA 10.000 _________._____ _________._____ 0030 202.15 REMOVING EXISTING MANHOLE OR CATCH BASIN EA 13.000 _________._____ _________._____ 0040 202.202 REMOVING PAVEMENT SURFACE SY 10,000.000 _________._____ _________._____ 0050 202.203 PAVEMENT BUTT JOINTS SY 110.000 _________._____ _________._____ 0060 203.20 COMMON EXCAVATION CY 8,220.000 _________._____ _________._____ 0070 203.21 ROCK EXCAVATION CY 75.000 _________._____ _________._____ 0080 304.14 AGGREGATE BASE COURSE - TYPE A CY 7,350.000 _________._____ _________._____ 0090 403.2081 12.5 MM POLYMER MODIFIED HOT MIX ASPHALT T