Specifications include, but are not limited to: Earthquake repair work includes Architectural, Structural, Mechanical., Electrical, and Hazmat removal for the associated work. The work is throughout the school, and moving, covering, and protecting furniture and equipment is required by the Contractor.; cutting and patching of nominally completed work, and is defined to exclude integral cutting and patching during the manufacturing, fabricating, erecting, and installing process for individual units of work.; Glass includes prime glass, processed glass and fabricated glass products. Glazing includes glass installation and materials used to install glass. Types of work in this section include glass and glazing for window in IMC L101.; 1. Performance criteria for gypsum board assemblies.; 2. Metal stud wall framing.; 3. Acoustic insulation.; 4. Gypsum wallboard.; 5. Joint treatment and accessories.