Specifications include, but are not limited to: The Work generally consists of furnishing and installing the following approximate quantities, which are separated into two (2) contracts: CONTRACT #1 – FACILITIES CONSTRUCTION: Construction of Facilities consisting of the following approximate quantities: 2 booster pump station buildings complete with pipes, pumps, yard piping and valves, site grading and all mechanical and electrical; one 155,000 gallon ground storage tank and pressure transmitter manhole; one meter building including piping, valving and site grading; all associated fittings and appurtenances; flushing and testing; signage; gravel; site work; and seeding. CONTRACT #2 – PIPELINE SYSTEM CONSTRUCTION: Construction of transmission pipeline consisting of the following approximate quantities: 59,300 feet of open-cut 12-inch pipeline; 142,800 feet of open-cut 8-inch PVC pipeline; 60 feet of cased, bored 20-inch steel pipeline; 390 feet of cased, bored 16-inch steel pipeline; 940 feet of uncased, bored 12-inch pipeline; 1550 feet of uncased, bored 8-inch pipeline; 7 12-inch gate valves; 9 8-inch gate valves; 1 connection to existing system; 11 flush hydrants and valves; 10 1-inch air/vacuum valves; flushing and testing; signage; gravel; and seeding.