Specifications include, but are not limited to: This project consists of the following areas and major components: General - Demolish and properly dispose of existing concrete, brick and bituminous asphalt sidewalks, site furnishings and noted features. Remove vegetation. Grub existing loam areas and stockpile for reuse. Excavate, bed, haunch, backfill and compact chilled water pipe trench (pipe by others). Install electrical and irrigation sleeves for future use. Install electrical conduit and rewire circuit for existing site lights from City Hall to the Annex as well as flag pole. Place select gravels, grade and place 4” reinforced concrete sidewalk as well as granite pavers. Provide site furnishings and plantings as noted in plans. Maintenance of Traffic - The contractor shall at all times obey and perform all applicable safety laws, regulations and ordinances that apply during the performance of the project. The contractor shall furnish, erect and maintain all temporary construction signs, cones, etc. necessary for the completion of the construction activities. Operation signs and warning devices shall be provided in sufficient type, quantity and placement configuration to meet the standards of the Manual of Uniform Traffic Control Devices, latest edition. Paved surfaces shall be kept swept clean, dust kept to a minimum and damages to existing pavement shall be repaired at no cost to CITY. The contractor will supply to the CITY representative a detailed drawing of proposed traffic control plan (TCP), specific to pedestrian circulation. The drawings will show, at least, location and text of all signs, temporary ADA compliant pedestrian access and designated work area. This TCP shall be submitted 2 weeks in advance and work will not commence until all traffic controls are in place.