Specifications include, but are not limited to: Countywide Bridge Inspection and Inventory Program in accordance with National Bridge Inspection Standards for Cycle Years 2023 through 2026; Routine: 24 Month Frequency Includes: Bridge #95 is a pedestrian structure which is not eligible per NBIS for Federal Funding, however, LPA wishes to keep on inventory for inspection. Other: Bridge No's 29, 32, 33, 64, 72, 108, & 215 are scheduled for replacement during the 2023 - 2026 inspection cycle and will require initial inspections upon opening to vehicular traffic and will eliminate the further need for reduced frequency inspections as applicable. Underwater: Bridge No. 1 has been approved for inspection of pier which cannot be accessed by boat. Inspection needs to occur in April 2024. Special: Bridge #95 is a pedestrian truss structure not eligible for Federal Funding, however, LPA wishes to keep on inventory for special inspection of fracture critical details. Bridges# 15 & # 159 require special inspections of F.C. details rated to be in poor condition offset Biennially from Fracture Critical inspection.