Specifications include, but are not limited to: reconstruction of Horace Greeley Road (12,652 LF) and Roberge Drive (1,763 LF), an asphalt overlay of Hubbard Rd. (2,106 LF), and an overlay of the Transfer Station parking lot (2,370 SY).; Part A - Road Reconstruction: This Work includes (but is not limited to): preparatory survey work; removal of stumps and other obstructions; excavation; furnishing and installing base course materials; furnishing and installing hot bituminous pavement; reclaimed stabilized base - processed in place; furnishing and installing storm drains, culverts, and underdrain piping; furnishing and installing guardrail; furnishing and installing bituminous or granite curbing; maintenance of traffic; erosion control measures; installation of loam and seed; installation of shoulder gravel; installation of pavement markings; and miscellaneous work and clean up. The full extent of the Work is more specifically shown and described in the bid schedule. Note: At the contractor’s option, reclaimed road material meeting the gradation requirements of 304.32, may be used in place of 304.32 shoulder gravel. If the reclaimed material does meet 304.32 gradation requirements, the town has the option to waive this requirement.; Part B - Asphalt Overlay/ Parking Lot Paving: The Work covered by this section includes but is not limited to installing a ½” leveling course, and/or 1.5” top-coat on an existing asphalt base. The existing paved surface shall be thoroughly cleaned of all loose aggregate particles, dust, and other objectionable material by the use of power brooms, power blowers, power vacuums, or other means prior to paving. Asphalt emulsion shall be applied to properly bond the new layer of asphalt to the existing layer.