Specifications include, but are not limited to: The project involves the renovation of the existing HVAC system throughout the school.; Construction Schedule 1. The following Schedule is applicable to all bidders. The durations in the schedule are based on 5 day work weeks. 2. The Construction Schedule as approved by the Construction Manager and Owner will be an integral part of the Contract, and will establish interim work completion dates for the various activities. 3. The Construction Schedule may vary in accordance with construction conditions. Each Trade Contractor shall delay or expedite material and equipment deliveries, and modify the required labor forces to accommodate these varying conditions. 4. Work is to commence upon receipt of the Letter of Authorization to proceed. 5. Within fifteen (15) days after receipt of a “Letter of Authorization to proceed”, each trade Contractor shall submit a detailed preliminary Construction Schedule to the Construction Manager. The schedule will include breakdowns of total man days of field labor into major categories of work, time estimates of various categories of work, and the crew size for each category. 6. Each Trade Contractor shall organize his Construction Schedule per Phase, Building, Area, and/or Floor as required by the Construction Manager. 7. Each Trade Contractor shall be responsible for participating in pull-planning sessions with WT 8. The Construction Manager shall schedule a meeting with the Trade Contractor to receive the contents of each Trade Contractor’s preliminary Construction Schedule, coordinate the sequence of work, and make all revisions required. The Construction Manager shall have the final authority concerning the sequence of work and durations of each activity. Each Trade Contractor shall revise his schedule in accordance with that meeting and submit his schedule to the Construction Manager for approval. The Construction Manager will then develop the Project Construction Schedule. Each Trade Contractor shall schedule and perform his work in accordance with the Construction Manager’s Project Construction Schedule. 9. The Schedule shall be the basis for the dates to start and complete work for various portions of each contract, and to complete work (including changes) for the Project. It shall be the duty of the Trade Contractor to conform to the approved Schedule and to arrange his work in such a manner that it will be installed in accordance with the Schedule.