Specifications include, but are not limited to: Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 13,747 tons of ¾” Commercial Plant Mix Grade S PG 64-28 asphalt mix material. The overlay shall be paved .10 feet thick and approximately 24 feet wide. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above. All Three bridges will require bridge deck cold milling the bridges are located at these mileposts, at 11.3 milepost bridge deck is 59’ long the mill depth .06’ with 100’ taper each end, at milepost 14.3 bridge deck 97’ long the mill depth is .06’ with 100’ taper each end, at milepost 15.1 bridge deck is 27’ long mill depth is .06’ with 100’ taper each end. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above.