Specifications include, but are not limited to: CITY will remove all plant mix, sidewalk, curb & gutter, and driveway necessary to complete its own work. Following CITY’s work, CITY will backfill excavations with base gravel to within 0.10 feet of finished grade of existing plant mix and/or concrete. CITY will then identify removal limits at each site for contractor’s work, estimate surface restoration quantities, and issue Contractor a surface repair work order. Contractor will saw cut, remove, and dispose of debris (plant mix, excess base gravel, sidewalk, driveway/approach, and curb & gutter); prep area for paving, including fine grading and compaction of ¾” base gravel; adjust valve boxes, curb boxes, and meter pit/manhole rings & lids to final grade, install all concrete sidewalk, driveway/approach, and curb & gutter; place and compact plant mix. Contractor recognizes that some locations may not require replacement of all items. CITY commits to a minimum of 150 locations requiring a form of surface repair in the year 2022.