Specifications include, but are not limited to: Typical of the work performed will be:•Transportation – Contractor shall be able to transport a 20-ton rolling load to andfrom remote parks, with a vessel suitable for easy loading and unloading onsometimes uneven, sometimes steep services. Consistent schedule of 2-4 days /month is typical, with additional days as needed.•Trucking - Contractor may also move loose materials using their own equipment.•Diving – Mooring inspections, diving water lines, emergency diving, channelinspections.•Marine Construction and maintenance – replacement of moorings, etc.For Each Assigned Project:•Meet with assigned FPR staff to determine scope, desired result, deadlines,schedules, lines of communication for the project.•Review project location.•Submit proposed scope of work and complete estimate of labor and materials for theproject to Parks Regional Facility Manager for approval.