Specifications include, but are not limited to: The work consists of construction of green stormwater infrastructure projects, soil remediation/capping and ballfield/court improvements (Pierce Park) at the designated sites on River Street, Samoset Avenue and High Street in Central Falls, RI. Work includes demolition and preparation of the site, grading, contaminated soil removal, construction of the following GSI systems: underground infiltration system, underground infiltration system/sand filter, tree trench (BMPs), associated drainage network improvements, porous pavement basketball court, little league baseball field improvements, permeable pavers, fencing, sidewalks, curbing, paving, landscaping, and all associated work as shown on the Construction Drawings.