Specifications include, but are not limited to: The Town of Strafford invites the submission of project bids for removal and replacement of an existing bridge (BR#23) and the design, permitting and construction of the new bridge located on Justin Morrill Highway (TH2). The proposed work includes the design, permitting, and construction of a 24-foot minimum clear-span, double-lane Bridge with a clear height of at least five (5’) from the average stream bed to the bottom of the deck, and should have a minimum waterway opening of 120sq.ft. (See Hydraulic Study Recommendations.) The design of the new bridge shall be submitted for review to the Vermont Agency of Natural Resources Rivers Management Engineer. The design of the new bridge shall meet the requirements of the Vermont Agency of Natural Resources Stream Alterations Permit Standards.