Specifications include, but are not limited to: The project consists of four schedules. Schedule One includes upsizing 1,265 linear feet of 15-inch sewer main with 1,265 linear feet of new 18-inch Polyvinyl Chloride (PVC) sewer main; upsizing 770 linear feet of existing 15-inch main with 770 linear feet of new 21-inch PVC sewer main; upsizing 1,180 linear feet of existing 18-inch sewer main with 1,180 linear feet of new 21-inch PVC sewer main; installing new manholes; and reconnecting the sewer services. Schedule Two includes Cured-InPlace-Pipe (CIPP) rehabilitation with spot repairs of 5,370 linear feet of existing 8-inch sewer main, installing new manholes and lining existing manholes, and reinstating sewer services. Schedule Three includes CIPP rehabilitation with spot repairs of 5,970 linear feet of existing 8-inch sewer main, installing new manholes and lining existing manholes, and reinstating sewer services. Schedule Four includes replacing 1,895 linear feet of existing 8-inch sewer with 1,895 linear feet of new 8-inch PVC sewer main, CIPP rehabilitation with spot repairs of 690 linear feet of existing 8-inch sewer main, installing new manholes and lining existing manholes, and reinstating sewer services.