Specifications include, but are not limited to: Seal & Cover, Guardrail, Pavement Markings on the Three Forks ? East project located in Gallatin County. This project is located on Secondary Rout 205 (S-205). The project begins at the I-90 overpass structure north of Three Forks at RP 0.0 and extends east 14.9 miles ending east of the Gallatin River structure at RP 14.9.; EMULSIFIED ASPHALT CHFRS-2P 403.400 TON; FINAL SWEEP AND BROOM 14.900 CRMI; COVER-TYPE 1 224,935.000 SQYD; GUARDRAIL END SECTION WIDENING 6.000 EACH; MGS GUARDRAIL 2,600.000 LNFT; MASH W-BEAM TERMINAL SECTION 6.000 EACH; MGS INTERSECTING RDWAY TERMINAL SECTION 75.000 LNFT; REMOVE GUARDRAIL 2,887.500 LNFT; TRAFFIC CONTROL-FIXED 500.000 UNIT; TRAFFIC CONTROL-LS 1.000 LS; CURB MARKING-YELLOW EPOXY 5.000 GAL; WORDS AND SYMBOLS-WHITE PAINT 6.000 GAL