Specifications include, but are not limited to: The work includes cured-in-place pipe lining of the sanitary sewer system and rehabilitation of the sanitary sewer systemʼs manholes and all other work required for the complete rehabilitated sanitary sewer system. Division “B” – Lift Station Improvements This project includes but is not limited to furnishing all labor, material, and equipment necessary to upgrade the collection system pump stations, including installing new pumps at Lift Station Number 2, replacing the pumps at Lift Station Number 3, and connecting Lift Station Number 3 to Wastewater Treatment Plant Power. The work includes bypass pumping and piping as necessary, control work, electrical work, restoration of all surfaces and pavements disturbed, and all other work required for the complete an operating system.