Specifications include, but are not limited to: two test stations will be installed on the pipeline between this facility and the Big Bend Treatment Facility. The work will be performed in the dirt/gravel area outside the paved roadway at the Big Bend Raw Water Pumping Station Site, Assessor Parcel No. 264-12-790-001. This project will consist of excavation safety and barricading, supplying and loading ten (10) anodes, provide and install PVC pipe, tremie pipe, coke breeze, backfill, cement sanitary seal, 24” manhole marked “SNWA ANODE WELL”, electrical conduit, pole mounted positing anode junction box, header cable, removal of existing pole mounted test station, test station box and concrete collar installation, splicing existing test station pipeline structure leads, pipeline leads to rectifier location, one inch conduit installation into existing vault structure, exothermic welds, conduit supports, concrete, site clean-up, removal and disposal of all construction debris, site restoration.