Specifications include, but are not limited to: 2.1 Construction Administration (CA) of the construction contract will be conducted by the consultant in full cooperation with the Project Manager (PM) designated for the project. 2.2 On-site personnel and equipment provided by the Consultant may include but are not limited to: • Project Engineer • Office Engineer • Materials Inspector(s)/Technician (s) • Electrical inspector • Field Inspector(s) with experience in earthwork, grade, surveying, and construction traffic control requirements. • SWPPP inspector(s) for environmental compliance. AK - CESCL certified • Field equipment including but not limited to nuclear density gauges , computers, networkprinter/scanner/copier, and software, mobile phones, safety equipment, rainwear, etc. • Fully equipped material’s laboratory 2.3 The project-specific NTP will identify the specific tasks as described in this Appendix B.