Specifications include, but are not limited to: furnishing all labor, material, and equipment to complete theproject FEEDER 53 REPLACEMENT as described in the specifications and shownin the plans. This project consists of electrical infrastructure improvements alongSan Felipe Drive and Mendota Drive. Work includes the excavation ofapproximately 8,534 linear feet of trenching, including the installation of various sizeelectrical conduits. This work shall also include the installation of underground vaults,junction boxes, pull boxes, aboveground fiberglass box pads & ground sleeves,concrete pads for various electrical equipment, and other miscellaneous relateditems. This work also includes the partial removal of existing vaults and replacementwith new vault sections/lids, construction of concrete collars & maintenance pads atelectrical equipment/structure locations, construction of stacked block retainingwalls. Removal & restoration of asphalt, curb, gutters, sidewalk, and drivewayswithin the scope of the project will be necessary.