Specifications include, but are not limited to: Schedule A, Slott Peak Waterline Improvements: Replace approximately 319 LF (E) water main with 8 DR-14 PVC or Class 350 DIP water main in Washoe Co. ROW. Connect to (E) 8 water main in Washoe Co. ROW. Connect existing domestic service lines. Construct one (1) fire hydrant assembly. Schedule B, PRV 3-1 Improvements: Replace two (2) 6-inch gate valves, three (3) 3-inch gate valves, and relocate the existing air release valve in an existing pressure reducing vault located in Washoe County ROW. The Work also includes: Abandonment of specified lines and valves, traffic control, maintain residential and business driveway access, erosion & sediment controls, pavement restoration, replacement of existing features, including vegetation, concrete, and other utilities removed and/or damaged by construction activity, acquisition of Washoe County street cut permits and all related appurtenances; compliance with County permit conditions and working within Right of Ways in Incline Village, Washoe County, Nevada.