Specifications include, but are not limited to: Task 1 – Control Survey and Preliminary Fieldwork: i. Preapplication conference with KPB (highly recommended). ii. Tie sufficient control monuments to establish Tip Levarg Subdivision parent parcel boundary. iii. Perform sufficient measurements on an existing or set primary monument to obtain an OPUS Shared Solution for the Basis of Coordinates (BOC). iv. As-built/locate survey of: 1. Roads, trails & etc. in and within 100’ of the parent parcel boundary, including Sterling Highway, Cohoe Loop Rd., and Tehama Ave. 2. The extent of encroachment of Tract A gravel pit into Lot 2 Block 1. 3. Above & below ground utilities in the project area and within 100’ of the parent parcel boundary, including all existing facilities for transmission line ADL 34484 and KenaiKatchemak Pipeline. Task 2 – Subdivision Design and Preliminary Platting: i. Identify any problems or conflicts. ii. Determine the positions of the controlling unmonumented section corners. iii. Section breakdown to compute unmonumented corner positions for the S1/2NW1/4 & N1/2SW1/4 of said Section 36. a. Verify monumented corner positions. iv. Provide DNR with draft preliminary subdivision design. Deliverables include: 1. A detailed project report/narrative discussing the project, field procedures used, conditions found, proposed solutions to problems, adjustments made to the parcel boundaries, and any other pertinent data; 2. An AutoCAD drawing compatible file and a PDF document printable at scale; 3. Digital copies of field notes, computations, proposed parcel closures and areas, and georeferenced photographs of recovered monuments.