Specifications include, but are not limited to: The Contractor shall complete all work as specified or indicated in the Contract Documents. The work is generally described as follows: Milling at bridge abutments and road tie-ins, and construction of 2-inch asphalt concrete hot-mix surface over paving fabric with tack coat on Batesville Pike. Work includes all labor, materials equipment, supplies, and incidental items necessary to complete the project in conformance with the plans and specifications and related contract documents.; 2” Cold Milling (Bridge Abutments and Tie-ins), QTY SY 178; 2” ACHM Surface Course (3/8”, PG 70-22) Over Existing Surface (Includes Installation of Mirafi MPV 500 Fabric with Tack Coat), QTY SY 27,915