Specifications include, but are not limited to: This project consists of removing brick pavers and reinstalling in a different configuration. In addition, new plantings and sod will be furnished and installed. The intent is to begin work as soon as the ground has thawed and dried out in the Spring of 2022.; A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.; B. Locate, identify, shut off, disconnect, and cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.; C. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.; A. The Contractor shall provide all materials, equipment, and labor, and perform all operations necessary to prepare the site for construction; provide or relocate utilities required; excavation (earth and rock) and grading; installation of brick pavements, bases; and landscaping.; B. Remove and salvage brick pavers for reuse in new configuration.; C. Remove and dispose of lawn area and loam below.; D. Excavate to undisturbed soil beneath the proposed brick terrace to achieve proper final grade for new brick pavers..; E. Site dewatering and erosion control during construction. (if applicable); F. Installation and relocation drain; G. Installation of aggregate subbase and base courses.; H. Loaming, mulching, and landscaping.; I. Erosion control measures as needed to minimize flow of silt and other material from disturbed areas into existing waterways.