Specifications include, but are not limited to: Project consists of providing all materials, labor, equipment, supervision, incidentals, and services required to perform a multi-phased multi-year construction project indicated for years 2022, 2023, and 2024. Restoration work will involve the following: structural concrete repairs to topping and precast planks, concrete topping removal and replacement, joint sealant removal and replacement, expansion seal removal and replacement, application of traffic bearing waterproofing membrane system, structural steel framing repairs, full paint system application to steel framing, masonry wall repairs, masonry and precast façade cleaning, traffic striping, floor drains and line replacement, stairway repairs, fire protection standpipe replacement, and other miscellaneous work that is identified to be completed in the Hanover Street Parking Garage. Work is intended to be performed over a 3-Year construction period in accordance with the Contract Documents.