Specifications include, but are not limited to: failing storm drain pipe will be replaced as part of this project.Three sections of pipe that run across State Street will be replaced from catch basin tocatch basin only. The new storm drain will be laid at the same invert elevations as theexisting pipes. Some work at the catch basins to enlarge the inverts will be required.Another section of storm drain will be coming from an existing catch basin in theintersection of Eastern Avenue and State Street and running near the curb line alongState Street to an existing catch basin on State Street. For this section, a new 4’ diametercatch basin will be installed at the corner of State and Eastern. All new storm drain willbe 12” HDPE stormdrain/underdrain with perforations.