Specifications include, but are not limited to: asphalt milling, HMA resurface and full depth replacement, aggregate roadway shoulder, pavement markings, curb and gutter, adjust/replace drainage castings, subgrade treatment, topsoil and seeding, and ADA curb ramps. The project will be constructed in ten (10) separate contract divisions, defined as follows: 1.Verplank Drive from US Highway 20 to Babcock Road; 2.Babcock Road from Verplank Drive to Old Porter Road; 3.Allegius Drive from US Highway 12 to 900 feet East; 4.Shadyside Drive from Hickory Lane to US Highway 12; 5.Marilyn Road from Salt Creek Road to Carol Street; 6.Whitney Street from Marilyn Road to South Boo Road; 7.Tanya Street from Marilyn Road to South Boo Road; 8.Burns Boulevard from US Highway 20 to South Boo Road; 9.Village Square South from Burns Boulevard to Harbor Way; 10.Village Square North from Burns Boulevard to Harbor Way