Specifications include, but are not limited to: complete the installation of the natural turf athletic fields andirrigation package at Seckinger High School. The project scope includes laser grading, soil preparation,irrigation design and installation, and natural turf athletic field installation. The scope includes designand installation of pumping system to provide irrigation from existing onsite wet pond. The system willhave a back-up connection to the public water system from existing irrigation meter and supply line.The project includes the baseball field, softball field, and football/soccer practice field. The project doesnot include any fencing or dugouts. The project does include the installation of the skinned infields withpitcher’s mound, bases and foul poles. The project scope includes necessary soil preparation. Outlinescope is general in nature. Work shall be accomplished per project manual and drawings.