Specifications include, but are not limited to: Stabilization of the Raft River High School Gym using an engineer designed solution of helical piers, cosmetic and structural repairs as specified in plans, and replacement of gym floor including investigation and resolution of moisture issue and installation of new gym floor per specs with moisture barrier. Project located at 55 N 100 West, Malta, ID 83342.; Stabilization of the Raft River High School Gym using an engineer designed solution of helical piers, cosmetic and structural repairs as specified in plans, and replacement of gym floor including investigation and resolution of moisture issue and installation of new gym floor per specs with moisture barrier. Project located at 55 N 100 West, Malta, ID 83342. .