Specifications include, but are not limited to: rehabilitate pavement at Taxilanes E1 and E3, and will reconstruct the Taxiway E/G intersection at the Ted Stevens Anchorage International Airport. The project includes pavement rehabilitation and reconstruction, new lighting, markings, signs, and storm drainage rehabilitation. ; P190.010.0000 Insulation Board, QTY 47,260 Square Foot; P209.020.0000 Crushed Aggregate Base Course, QTY 8,100 Ton; P401.010.0030 Hot Mix Asphalt Type II, Class A, QTY 12,598 Ton; P401.010.0065 Hot Mix Asphalt Type V, Class S, QTY 27,186 Ton; P401.040.5834 Asphalt Binder, PG 58-34E, QTY 2,190 Ton; P401.090.0000 Asphalt Material Price Adjustment All Required Contingent Sum; P401.130.0000 HMA Combined Price Adjustment All Required Contingent Sum; Intelligent Compaction for Asphalt Mix Pavements 500 P411.010.0000 All Required Lump Sum; P501.010.0000 Portland Cement Concrete Pavement, QTY 2,940 Cubic Yard; P603.010.0010 Tack Coat, STE-1, QTY 113 Ton; P605.010.0000 Joint Sealing Filler, QTY 7,785 Linear Foot; P620.010.0000 Runway and Taxiway Painting, QTY 27,890 Square Foot