Specifications include, but are not limited to: replace electric vehicle Gate nos. 3 and 9, and equip them with up-to-date security systems. This project will also install compatible and compliant security entry systems on pedestrian Gate nos. 4, 8, 11, and 13. This work will include installation of associated control equipment for all new systems.; 1. Preliminary research, site visit and stakeholder meetings.; 2. Topographic land surveys and geotechnical exploration.; 3. Preliminary Design (25% design level) and Preliminary Design Review Meeting.; 4. PIH Design (75% level) and PSE Design (100% level). A combined PIH/PSE Review meeting is anticipated. However, two independent design reviews (PIH and PSE) may be conducted depending on complexity and schedule.; 5. Final bid documents (sealed and bid ready).; 6. Assistance to the Department during bidding and construction.