Specifications include, but are not limited to: Provide topographic surveys for each of the street corridors identified for use in the design of capital improvement projects by the City. Tie horizontally and vertically all surface improvements within the right of way (i.e. curb, gutter, sidewalk, driveways, asphalt, trees, fences, ect.). Tie horizontally all buried and above ground utilities and provide vertical location on utilities that can be easily obtained ( i.e. sewer, storm sewer, valve boxes, ect.). Establish horizontal control and a minimum of one project benchmark on the City of Bozeman Datum on each street. Horizontal control can be on an assumed coordinate system. Provide a complete site map for each street. Deliverables for each street will include a hard copy of the site map, copies of all field notes, electronic copies of the site map, and all AutoCad Project files and point files. The City is currently using AutoCad Civil 3D 2022. Construction staking will be added on an as needed basis