Specifications include, but are not limited to: The Sewer Main Lining Project consists of the following tasks: Provide sewage bypass pumping to accommodate a peak measured flow of approximately 1,200 GPM for a minimum distance of 400 feet. Clean and video inspect sewer pipe, root cutting as necessary. Construct Cured In-Place Pipe (CIPP) Class III structural lining within 2,563 feet of 24” Asbestos Cement (AC). Grout annular space and service connections to prevent collapse of liner and install watertight seals to host pipe. Leaky sewer services shall be grouted with chemicals to stop infiltration in the sewer collection system. Provide sprayed-in epoxy sewer manhole lining, up to 55 vertical feet in six structures