Specifications include, but are not limited to: 1. Consultant Design Phases/Deliverable Requirements: The following design phases with corresponding design deliverables shall be required for this project. See “Deliverables Checklist” (Appendix B, FPSA) and referenced District Design Guidelines for additional information on submittal requirements. a. Schematic Design Phase Submittal (35%); b. Design Development Phase Submittal (65%); c. Construction Document Phase Submittal (95%); d. Bid Documents Submittal (100%); 2. Phase 1 Design Development; a. Develop Project Scope and Design; Prepare Construction Drawings and Specifications with cost estimates; i. Verification of the Planned Project Scope of Work: As part of the Schematic Design Phase work, the Consultant shall verify and update the Planned Project Scope of Work. Consider sequencing and phasing of the work around the school’s schedule, and provide recommendations. Cursory review of the District’s hazmat documentation will be necessary to ensure the project is viable and will remain within budget. The Consultant shall consult with the District Project Manager for any deviation from the Planned Project Scope of Work prior to completing the Schematic Submittal. Schematic Submittal shall reflect the final approved project scope of work. Value engineering and innovative design solutions are encouraged.; 3. Phase 2 Construction Administration & Closeout – may be included at a later date when construction funding is available. a. Perform Construction Administration Services i. The Consultant’s services include attendance at the pre-construction conference and other scheduled meetings during construction.; ii. Review of submittals; respond to Requests for Information (RFIs), Potential Change Orders (PCOs), DCVRs, Information Bulletins, inspections, reviews of contractor pay requests, and review of closeout documentation.; iii. If part of the project, the consultant will participate in commissioning