Specifications include, but are not limited to: construction of new sidewalks and trail. The first is new 5’ wide concrete sidewalk along the north side of Marshall Street from Freedom Street to the entrance to the Colonial Court Mobile Home Park. There is a proposed crossing at the entrance to the Community Park, which will connect this new sidewalk into existing sidewalk on the south side of Marshall Street. Additional new 5’ wide concrete sidewalk will be built from the terminus of existing sidewalk to Michigan Street, and north on the west side of N Michigan street to the town limits. New 8’ wide asphalt trail will be constructed on the east side of N Michigan Street from Marshall Street to the northern town limits. There will be construction of new 5’ wide concrete sidewalk on the south side of Walnut Street from Pond Street and the north side of Walnut Street to Clinton Street. The 8’ wide asphalt trail will be along the west side of Pond Street from Woodland Trail to the entrance of Pond Park. This trail will be connected to the trail along SR 10 by a sharrow along Woodland Trail, making the low residential street available for thru bicycle traffic.