Specifications include, but are not limited to: 3.1.2 Data Gathering: Contractor shall review the information provided by POA for the purpose of completing the required design and construction. If the Contractor determines that additional technical data is required to complete the Work, it shall be at the Contractor’s own expense. 3.1.3 Geotechnical Investigation: The Contractor shall be responsible for the collection and analysis of geotechnical information associated with the design of the building, utilities, drainage structures, hardscapes, roads, and parking areas. The Contractor shall identify such additional subsurface exploration as part of their proposal. The borings shown in Section XII of this RFP package are provided for information purposes only.