Specifications include, but are not limited to: a) Provide Design and Engineering services for the project as referenced in this Agreement.; b) Review the draft Conceptual Design Report (CDR) completed by Taku Engineering dated January 6. 2021.; c) Visit Point Lay, Alaska to gather and verify pertinent information needed to further develop the concepts, recommendations, and conclusions described in the CDR.; d) Conduct a Pre-Design meeting to discuss findings from the CDR, design scope, project scope, deliverables, and scheduling.; e) Submit 35% Schematic Design, 65% Design Development, and 95% Construction Documents and conduct a design review meeting for each phase of design.; f) Provide a construction cost estimate for each phase of design. The total cost estimate should include, at a minimum: construction labor and materials, freight, equipment, construction debris removal, general requirements, overhead and profit, administration and management, and contingencies.; g) Submit Bid-Ready 100% Construction Documents.