Specifications include, but are not limited to: Pre-Construction Phase • Participate in regularly scheduled design progress meetings (weekly) with the Design Team, the various consultants, and Carson City. The CMAR shall provide ongoing input with respect to design schedule, constructability, construction costs, material selection, value engineering, and construction means and methods. Assist in consideration of different design/material/life cycle elements. • Participate in meetings with the Owner and Design Team, utility companies, property owners, and local businesses to expedite the design/permit process. Provide a prime contact to establish relationships with project stakeholders prior to the construction phase; Construction Phase • Coordinate with the City and other stakeholders as necessary. • Facilitate, and contribute, to public outreach process. • Arrange for procurement of materials. • Schedule and manage construction operations. • Bid, award (with Owner input) and manage all construction related contracts. • Provide quality control. • Bond and insure the construction.