Specifications include, but are not limited to: • Construction drawings, specifications, and estimate of construction costs for three defined submittals (65%, 95% and Final).; • Building material and equipment recommendations based on local conditions, experience, quality, ease of maintenance, and price.; • All work must be in full compliance with the current International Building Codes as well as all other pertinent federal, state and local codes.; • Age of facilities suggest possible hazardous materials may be present in existing construction materials. Proposer shall provide reporting that covers areas impacted by this project and specifications that address safe handling during construction.; • The Proposer is responsible for all aspects of design including, but not limited to, mechanical, electrical, architectural, structural, permitting, and cost estimates.; • The City Hall building’s fire alarm system is outdated and will need to be replaced in conjunction with this project.