Specifications include, but are not limited to: The Base Bid Work shall include: • The installation of one new submersible non-clog lift station, 20 LF of 10” PVC Gravity Sewer with granular backfill, 42 LF of 6” Ductile Iron Force Main, one 48” Doghouse Sanitary Manhole, 100 LF of 16” HDPE Casing w/ 8” HDPE Carrier Pipe via horizontal directional drilling, 2,861 LF of 8” HDPE Force Main via horizontal directional drilling, connections to existing sanitary manholes, electrical equipment, fencing, clean-up and restoration, 15 VF of Cementitious Manhole Lining with Epoxy Coating, and all other work and appurtenances necessary for complete installation. Additionally, work shall include demolition of the existing lift station, which consists of a precast concrete wet well, an adjacent steel dry well, and ancillary equipment.