Specifications include, but are not limited to: 1. LOT 1: SNOW AND ICE CONTROL. 1. Contractor shall provide for all supervision, materials, equipment, labor, and supplies to provide snow plowing, sanding and snow removal to allow access to all of the identified facilities that the Department of Military and Veterans Affairs maintains in Juneau area.; 2. Sidewalks are inclusive of their assigned areas.; 3. In the event of heavy snow accumulation during working hours, 7:00 a.m. – 4:00 p.m., the Contractor will be notified and expected to commence work within four (4) hours of notification.; a. Roads are to be kept clear to a width to include two (2) feet outside the white painted lines (fog line) of the road edges. Where no fog lines exist, roads are to be kept clear two (2) feet outside the road edges.; b. Maximum accumulated snow and ice on the road surfaces shall be less than 1 inch.; c. Plowing that does not meet the minimum depth and width requirements will be deemed deficient and the contractor will be required to correct the deficiency at no charge.