Specifications include, but are not limited to: 1. TEAR OFF EXISTING SPRAY FOAM INSULATION & EXISTING BUILT-UP ROOF SYSTEM TO EXISTING WOOD ROOF DECK. REMOVE ALL DETERIORATED EXISTING ROOF DECK, BASE FLASHING, CANT STRIPS, EXPANSION JOINT COVERS & COUNTER FLASHING, THROUGHOUT. EXISTING WOOD DECK SHALL REMAIN IN PLACE AND BE PROTECTED DURING CONSTRUCTION, PATCH AND REPAIR ALL DAMAGES CAUSED OR NOT CAUSED BY CONSTRUCTION, REFER TO SPECIFICATIONS.; 2. COMPLETELY REMOVE THE EXISTING SPRAY FOAM INSULATION FROM ALL PARAPET WALLS, BUILDING WALLS & STONE CAPS TO THE ORIGINAL SUBSTRATE.; 3. INSTALL NEW THERMOPLASTIC POLYOLEFIN ROOF SYSTEM AND INSULATION SYSTEM AS SPECIFIED. WORK SHALL ALSO INCLUDE ALL HVAC AND ELECTRICAL, PIPING DISCONNECT AND RE-CONNECTION WHERE REQUIRED. NEW METAL FLASHING AND SHEET METAL ACCESSORIES ARE TO COMPLY WITH THE REQUIREMENTS IN THE DIVISION 7 SECTION “SHEET METAL FLASHING AND TRIM.”