Specifications include, but are not limited to: 1. Procurement and installation of bypass pumping and piping, connection of bypass piping to existing piping, and demobilization of bypass piping. Bypass pumping to include a minimum of four diesel pump skids rated for five MGD each. See plans and spec for more detail. ; 2. Miscellaneous demolition of existing structural, electrical, pump and piping equipment as shown on the Drawings.; 3. Installation of pump station equipment and piping, including but not limited to pumps, motors, variable frequency drives, pump control valves, piping and valves, switchgear and motor control centers, other general electrical work, instrumentation and control, HVAC units, and miscellaneous work associated with the above and as shown on the Drawings or as specified. ; 4. Installation of pedestal motor operated actuators on three (3) existing butterfly valves including miscellaneous electrical and instrumentation and control work as shown in the Drawings and as specified.; 5. Construction of equipment pads.; 6. Coordination and interface with the power company.; 7. Construction of all on-site power and instrumentation modifications.; 8. Restoring the project area upon completion of the construction.