Specifications include, but are not limited to: This work involves all driveways, parking areas, walkways, ramps, steps and entrances that are adjacent to or part of the facility. The public sidewalks abutting the building on both Church and High streets are included as is the walkway from the Church street sidewalk to the oil fill pipe on the northwesterly side of the building. These areas MUST be cleared of accumulated, drifted, and ice packed snow, sanded and salted as necessary to ensure safe passage. Sanding of the walkway from the High street sidewalk to the oil fill pipe is not required unless severe icing conditions exist. During normal working days, Monday – Friday (except holidays on which the court is closed) snow accumulated during the preceding night or non-work day MUST be cleared prior to 7:00am. During normal working hours (7:00am to 5:00pm, Monday-Friday), the removal of snow will begin after the accumulation of 2 inches of snow under normal conditions, but will be subject to the facility’s discretion. The contractor must provide the sand/salt mix for all areas.