Specifications include, but are not limited to: 1. Review the 2007 Scoping Report (Appendix 1) and reflect a comprehensive on-site inspection of the existing trail path 2. Use existing, natural materials or gravel to create the best quality trail upgrades and repairs that satisfy the project goals 3. Employ trail building best practices in Vermont Town Forest Trail Design Guide (Appendix 1). 4. Create a minimum 6-foot corridor where possible 5. Achieve a level or gently sloping surface grade 6. Minimize environmental impacts on vegetation, terrain, the natural landscape, wetlands and streams, and surrounding vicinity (motorized equipment is allowed for the purposes of trail building). 7. Use reroutes where needed that achieve the desired path, grade, and surface quality while avoiding the need for Agency of Natural Resources permitting as much as possible. 8. Demonstrate compliance with the 2013 license agreement between Great River Hydro and the Town of Wilmington (Appendix 1), honor the Grant of Conservation Restrictions with Vermont Land Trust (Appendix 1), and reflect a complete review of the Wilmington Rail Trail Wetlands & Streams Crossing Wetland Permit Plan located in Exhibit A of the License Agreement between Great River Hydro and the Town of Wilmington (Appendix 1).