Specifications include, but are not limited to: 1. POWER WASH THE EXISTING ROOF SURFACE AND ALLOW TO DRY BEFORE ANY APPLICATION OF NEW ROOFING MATERIALS. 2. WORK SHALL INCLUDE REMOVAL OF ANY EXISTING BLISTERS OR RIDGING IN THE EXISITNG MODIFIED BITUMEN ROOF MEMBRANE. 3. INSTALL NEW ½” PER FOOT CRICKETS AS SHOWN ON THE ROOF PLAN. 4. ADHERE SPECIFIED ½” SUBSTRATE BOARD AS SPECIFIED. 5. ADHERE ONE PLY OF THERMOPLASTIC SINGLE PLY FLEECEBACKED MEMBRANE AS SPECIFIED. 6. INSTALL NEW MISCELLANEOUS CARPENTRY AND NEW PREFINISHED GUTTER ASSEMBLY AS SPECIFIED. INSTALL NEW PREFINISHED METAL COPING CAP AND FLASHING METAL AS SPECIFIED. 7. PROVIDE NEW ROLLER SUPPORTS FOR EXISTING PIPING ABOVE ROOF. 8. PROVIDE NEW CAST IRON STRAINERS ON ALL DRAIN BOWLS. 9. ALL WORK SHALL INCLUDE ALL HVAC AND ELECTRICAL PIPING DISCONNECTS AND RECONNECTION AS REQUIRED TO COMPLETE THE PROJECT. 10. ALL INSTALLATION OF NEW WORK SHALL BE PER NRCA, SMACNA, ASNI/SPRI, SPECIFICATIONS, DETAILS AND MANUFACTURER’S GUIDELINES.