Specifications include, but are not limited to: ClimaCool Heat Pump 1 EA - Each; Provide a factory-authorized service representative to inspect, test, and adjust field-assembled components and equipment installation, including connections, and to assist in field testing. Report results in writing. Perform the following field tests and inspections and prepare test reports: After heat pump module is installed by University and after electrical circuitry has been energized, test units for compliance with requirements. Inspect for and remove shipping bolts, blocks, and tie-down straps. Operational Test: After electrical circuitry has been energized, start units to confirm proper unit operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. Remove and replace malfunctioning units and retest as specified above.